Project Description
CLIENT : Al Massaleh Real Estate Co.
Construction, Execution & Maintenance
* The Project is A High – Rise office Tower Consisting.
* Basement
* Ground Floor
* Mezzanine
* 2 Services Floor
* 16 Typical Floors ( Offices)
Construction, Execution & Maintenance
* The Project is A High – Rise office Tower Consisting.
* Basement
* Ground Floor
* Mezzanine
* 2 Services Floor
* 16 Typical Floors ( Offices)
Utilities Tunnel at New Kuwait University Campus
KCPC was responsible for construction, completion and maintenance of a 7×7 meter underground utilities tunnel. The tunnel is 4KM long, linking the basements of several colleges with the Central Utility Plant and the public shelters.
Construction of the new head office of the Kuwait National Petroleum Company (KNPC), which includes an office space spread over 42,000m2 and also Parking area for 600 Vehicle Additional Scope
•Construction of Strom Water and Sanitary Drainages System
• Road Paving •Electrical & Mechanical Installations
•Elevator and Escalators Supply and Installations
•Interiors Finishing &
•Landscaping KNPC’s building won an International Award for this Design .
RA225
Construction, completion and maintenance of roads, storm water streams, sanitary drainages and other services for the developed road from Saad Al-Abdallah Area Road to the Bohaith Gate. It is located north east Kuwait with a length of 28 KM. It comprises four lanes for each direction, four crossings and bridges, in addition to three railway crossings.
Messilah Beach 5 star Hotel and other related building approx.
89,000m2 total built up space wholly on site A and extensive hard soft landscaping works on sites A & B and refurbishment of existing parking and roads construction of around about etc. and utility connection works on sites C.
EQUATE Headquarter
Construction, completion and maintenance of Equate Headquarters Complex which consists of the main office building, a multi-purpose building, a mosque, sunken garden and a car park building (190 cars), built on an area of 20,000 m2. The office building has a circular atrium with ample public spaces, panoramic elevators and ceremonial staircases. Offices are located on the first and second floors.
RA/237
Construction, Completion and maintenance of roads, bridges, storm water and sanitary streams and other services for the road connecting between Al-Zoor Port and Wafra. The project is located south Kuwait on a length of 33KM and consists of five crossings and bridges with three lanes in each direction.
Mussaed Al-Saleh Health Center Project – MSHC
Construction, Completion and Maintenance of Mussaed Al-Saleh Health Center located in Shaab Area. The center will provide health services for residents of Shaab and adjacent areas with a large scale clinic over a built up area of 6,614m2. It consists of various sections (Family Practice, Specialized Clinics, Dental Clinics, Emergency, Laboratories, Radiology, Auditorium).
Design & Built of 3 basement plus ground floor and 36 floors.
In addition a grand main entrance with an atrium of 12 m height with a special design curtain glass wall. The tower has six parking level at podium..
Client : Ministry of Public WorkCompany
DEPARTMENT : Civil
ROLE : Main Contractor
6 Multilevel Car park with 2 bridges connecting existing hospitals in various area in Kuwait.
The car parks were executed on a fast track design/ Built method using Precast- Concrete.